Andromeda welcome CAD Engineer Steve Oulton to the team
Wishing our clients, customers and colleagues a very Happy Easter!
The Andromeda LV design team recently completed a lighting report on West Drayton depot for our client SEP Rail Services
Andromeda begin preparation of the detailed design for the South Wales Metro Transformation Project Survey on the Merthyr Tydfil line
Andromeda raises hundreds of pounds for the Whitechapel Centre for the third year running.
Our engineers have been out on site surveying the Merthyr line (pictured).
This update will be carried out to Network Rail Standard, Electrical Safety Measures for Working on the Operational Railway with Overhead Electrification (NR/L3/ELP/25000).
Alongside our partners, Andromeda were delighted to be nominated, shortlisted and awarded Highly Commended in the Infrastructure Achievement of the Year category.
A Type 2 electric car charging point has been installed at our Andromeda Head Office in Speke, Liverpool.
Today is ‘Time to Talk Day’. The more we talk, the more people can ask for help when they need it, because mental health matters.
Andromeda Engineering Ltd
14 Hurricane Court, Liverpool, L24 8RL